The purpose of this document is to allow any individual to assess whether they are carrying out, or arranging to carry out construction work and then whether they have a requirement to appoint a Project Supervisor Design Process (at or before the commencement of design) and a Project Supervisor Construction Stage (before the commencement of construction work) under the Safety, Health and Welfare at Work (Construction) Regulations 2013 and or the Safety Health and Welfare at Work Act 2005. It is advisable to complete this document for every potential project that may require such statutory appointments. This document provides evidence that Statutory Duties were considered.